Energymascon
Platform · Intelligent MES

An MES that sees the floor.

Scheduling, dispatch, quality, and traceability. All built on the live machine data stream. The plan and the production talk to each other every second, not at the end of every shift.

Schedule · actual · todayLive
06:0012:0018:0000:00
JOB-4128
Cell A · Mill
JOB-4131
Cell B · Turn
JOB-4133
Cell C · 5-axis
JOB-4140
Cell D · Grind
JOB-4142
Cell E · Mill
On-time 3
Slipping 1
Auto-rescheduled 1
Home·Platform·Intelligent MES
The difference

Most MES stacks are written. Ours reads back.

Classic MES is a system of record: what was planned, what was reported, what was signed for. An intelligent MES adds a system of signal: what actually happened, second by second, from every machine on the floor. It feeds that back into the plan.

Classic MES

System of record

  • Operators log what happened
  • Shift reports reconcile to the plan
  • Quality enters after the lab
  • Schedule re-runs once a day
Useful for compliance. Not useful for decisions before the shift ends.
Intelligent MES

System of record + signal

  • Machines log what's happening, second by second
  • Schedule reacts in real time as cycles complete
  • SPC catches drift on the line, not in the lab
  • Every part has a parameter trail by serial
Useful for both. The system of record is a by-product of the system of signal.
Inside the platform

Four modules. One feedback loop.

Live scheduling

Schedules that know what the floor is actually doing.

Plan against the capacity the floor actually has, not the capacity the spreadsheet thinks it has. Every cycle, every stoppage, every setup flows back into the schedule so promised dates reflect reality.

  • Live capacity and load by cell, line, shift
  • Auto-reschedule on disruption
  • What-if scenarios for new orders
  • ERP and APS round-tripping
Today · across 6 cells
Cells × hours · today
On planSlippingStopped
Lives in your stack

An MES that connects in both directions.

We don't replace your ERP, scheduler, CMMS, or QMS. We connect to them and pass data both ways. Jobs, parts, schedules, and outcomes flow in both directions, with the audit trail to prove it.

ERP
SAP · Oracle · NetSuite
Scheduler
Asprova · Planet · custom
CMMS
Maximo · Fiix · SAP PM
QMS
MasterControl · ETQ
PLM
Teamcenter · Windchill
Controllers
FOCAS · OPC UA · MTConnect
Cloud
Azure · AWS · GCP
Edge
Energymascon gateway
The outcome

On-time delivery up. WIP and lead times down.

+18pp
On-time delivery
−27%
Work in progress
−22%
Lead times
0
Spreadsheet schedules left
Book a demo

See an MES the floor agrees with.

A 30-minute walkthrough of an Intelligent MES deployment with engineers who actually run the rollouts.